SAMSUN-KALIN HIGH SPEED RAILWAY PROJECT

Type of project
Simple Drapery
Year
2020
Location
SAMSUN - KARADENİZ - Turkey
Client
TURKISH STATE RAILWAY AUTHORITIES

Challenge

The Samsun-Kalın High-Speed Railway project is connecting the cities between Samsun and Sivas in central Turkey with a high-speed train line. At several locations along the almost 400 km long railway, rockfall problems occurred due to the highly demanding geological and morphological conditions of the slopes bordering the railway line. In order to establish a comprehensive rockfall protection project, the entire railway line has been surveyed and studied upon its geological conditions and several rockfall areas were determined and investigated in greater detail.

Solution

As a result of the geological investigations, simple drapery of the most critical slope areas with Double-Twisted Wire Mesh (Mesh Size: 8x10 and Wire Diameter 2.7mm) has been advised as rockfall protection system with respect to the technical and economic conditions of the project. The installation of the rockfall protection system is being carried out in cooperation with a professional mountain crew in 2018 and is still an ongoing project in 2019.

Download
the Success Story

SAMSUN-KALIN HIGH SPEED RAILWAY PROJECT

Download
SAMSUN-KALIN HIGH SPEED RAILWAY PROJECT

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *