SLOPE EROSION PROTECTION AT KELANTAN, MALAYSIA

Type of project
Slope Protection
Year
2020
Location
GUA MUSANG - KELANTAN - Malaysia
Client
Public Works Department Simpang Pulai

Challenge

The Jabatan Kerja Raya (JKR) authorities decided to build a new road from Simpang Pulai - Lojing - Gua Musang - Kuala Berang. During the construction, cutting of the hill was necessary to gain the road’s design width. The slope was stabilized with soil nailing. Due to steep angle and heavy downpour, the slope surface was prone to erosive activities.

Solution

In order to solve the problem, Reinforced Enkamat was proposed and subsequently selected. It was the preferred solution due to its engineering ability in reducing surface runoff. It also helps to enhance vegetation, thus holding soil particles during vegetation growth. The combination of Reinforced Enkamat and vegetation acted as a thick blanket to prevent surface erosion. Additionally, it brings green life to the original slope where grass can re-grow. The economical benefit and ease of installation shows that Reinforced Enkamat stands out from the rest; and the end result bring out the effects as a natural and green slope without compromising its duty in engineering application.

Download
the Success Story

SLOPE EROSION PROTECTION AT KELANTAN, MALAYSIA

Download
SLOPE EROSION PROTECTION AT KELANTAN, MALAYSIA

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *