EMBANKMENT REINFORCEMENT AT BENTONG, PAHANG, MALAYSIA

Type of project
Reinforced Soil Walls and Slope Reinforcement
Year
2020
Location
BENTONG - PAHANG - Malaysia
Client
Public Works Department Pahang

Challenge

A road passing through hilly terrain crossed over the confluence of two hills where a stream passed through the ravine. The road was washed away during heavy downpour and the Government had to reconnect the road to its original route.

Solution

They had two options to decide upon; to build a bridge across or to rejoin the road and use the Terramesh System to reinforce the embankment of the road. The choice was clear as the cost of the latter was only 35% of the former. The Terramesh System was also chosen because of the flexibility and permeability of the structure. Having prepared a foundation platform, CMP pipe was installed first to drain the spring water away so as to obtain a drier work place for installing the Terramesh. Once the pipes are installed, a reinforced soil retaining structure was build to provide a new foundation for the road embankment. Upon completion of earthworks, the exposed embankment side slopes were either sodden or grass seeded.

Download
the Success Story

EMBANKMENT REINFORCEMENT AT BENTONG, PAHANG, MALAYSIA

Download
EMBANKMENT REINFORCEMENT AT BENTONG, PAHANG, MALAYSIA

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *