SOUNDSTORM FESTIVAL PROJECT

Type of project
Reinforced Soil Walls and Slope Reinforcement
Year
2023/2024
Location
BANHAN - RIYADH - Saudi Arabia
Client
MDL Beast
Designer
Robert Bird Group

Challenge

The Soundstorm festival project involves transforming a desert landscape 40 km outside of Riyadh into a festival ground for hosting the biggest and boldest music festival in Saudi Arabia. The project includes many structures such as the Big Beast, the VIB Towers, the Dance Tent, walkways, and some bridges. As some of the bridge ramps were expected to reach a height of 6 meters, retaining structures were required rather than conventional slopes. Due to the time constraints, the project stakeholders looked for a Mechanically Stabilized Earth wall system (MSE Wall), that could be constructed quickly, but also minimally interfere with the desert environment. As the time constraints in the project became more severe, it was decided to construct the MSE wall as True Bridge abutment structures, in which the bridge girder will be supported directly within the backfill of the MSE wall through a bank seat. Thanks to the competent foundation soil strata through the presence of highly fractured marly limestone at a shallow depth of 0.5m to 1m, that could support the MSE Wall and the bridge loading, without undergoing excessive settlement.

Solution

Maccaferri’s Paramesh wall system (Terramesh facing & Paragrid geogrids) was chosen as the desirable type of MSE wall in the project. The Terramesh facing being robust and flexible, the heavy concentrated bridge loading of 115 kPa could be safely absorbed. Additionally, the Terramesh units meets the architectural requirement as the gabion face could be filled with the local limestone that creates least visual intervention with the desert surroundings. Thanks to the superior quality BBA certified Paragrid geogrid adopted in the bridge abutments to absorb the tensile stresses generated by high concentrated loads. Three bridges in the project were done using Paramesh wall system, namely East Mound, West Mound and BIP Bridge. While Maccaferri’s in-house Macstars software was used for stability analysis, Plaxis finite element software was used for wall deformation and settlements analysis. Maccaferri Middle East was subcontracted for design, supply, and construction assistance of the Paramesh MSE true bridge abutment walls in the project.

Download
the Success Story

SOUNDSTORM FESTIVAL PROJECT

Download
SOUNDSTORM FESTIVAL PROJECT

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *