SALALAH LPG EXTRACTION PROJECT

Type of project
BASAL REINFORCEMENT
Year
2020
Location
SALALAH - SALALAH - Oman
Client
Salalah LPG SFZCO LLC (SLPG)

Challenge

In 2017, ‘Petrofac Onshore Engineering & Construction’ secured the contract with ‘Salalah LPG SFZCO LLC’ to undertake the engineering, procurement, and construction of its Salalah LPG extraction project in the southern part of Oman. Under the terms of the 36-month duration EPC contract, the scope consists of the construction of the liquefied petroleum gas (LPG) unit and associated facilities, including tie-ins to existing pipeline infrastructure, together with LPG storage and jetty facilities at the Port of Salalah. The storage facilities in the project involved construction of two large tanks that will store butane and propane. The cryogenic double-walled circular tanks will be of height 43m and diameter 40m, constructed on a 1.5m thick concrete raft foundation of diameter 45m. Considering the existing soil conditions at the project site, the calculated settlement due to the final load of 450KPa (below the concrete raft foundation) will be 171mm which exceeds the allowable limit of 150mm. This scenario necessitated the adoption of suitable ground improvement techniques below the foundation of the two tanks to Limit the settlements.

Solution

Since conventional ground improvement techniques like stone columns, deep replacement etc will be time consuming and expensive, the EPC contractor approached Maccaferri to propose an alternate geosynthetic solution. After studying the geotechnical reports, Maccaferri proposed a 1.5m thick and 50m wide geogrid raft below the concrete foundation of the tanks. Considering a 45-degree dispersion of the loads through geogrid raft, the initial load of 450KPa reduces to 396KPa before transferring to the natural soil. The resulting settlement with the reduced 396KPa was 149mm which is within the acceptable limit of 150mm. The 1.5m thick geogrid raft consisted of 3 layers of high strength geogrid type ParaLink, at a vertical spacing of 0.5m. The bottom layer of geogrid required 300KN/m strength while 200KN/m was enough for the top two layers. The installation and backfilling of geogrid works were completed within two weeks, saving time and money for the EPC contractor. Maccaferri was involved in design, supply and site assistance of the project.

Download
the Success Story

SALALAH LPG EXTRACTION PROJECT

Download
SALALAH LPG EXTRACTION PROJECT

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *