Reinforced Soil Retaining Wall in Luton Sustainable Chalk Stabilisation with Mineral Terramesh®

Year
2019
Location
Luton, Bedfordshire, United Kingdom
Client
Redrow Homes
Designer
Ground Engineering Solutions Ltd (GES)

Challenge

A former Vauxhall Motors factory site on the outskirts of Luton was acquired by Redrow Homes for residential development, offering a prime location but presenting significant engineering challenges. The brownfield site featured steeply sloping terrain composed of structureless chalk, a material with limited load-bearing capacity and poor stability when left untreated.

To maximise land use efficiency and enable viable housing layouts, the development required the formation of a series of engineered terraces. One key area demanded the construction of a retaining structure approaching 10 metres in height. The combination of steep gradients, weak chalk geology, and the scale of the proposed earthworks created a complex geotechnical problem requiring an innovative and cost-effective solution.

Solution

Rather than disposing of excavated chalk and importing quarried fill material, contractor GDL, designers GES, and Maccaferri developed a sustainable value-engineered solution. By applying cement stabilisation, the site-won chalk was repurposed as structural backfill for a reinforced soil retaining wall. This approach significantly reduced waste, eliminated off-site disposal, and minimised the environmental impact associated with importing new materials.

Maccaferri designed and supplied a Mineral Terramesh® reinforced soil retaining wall system, enabling the construction of a 9.6-metre-high structure with a steep 70° face angle. The system was reinforced with ParaGrid® polymer geogrids, providing long-term stability and ensuring performance under load in challenging ground conditions.

The Mineral Terramesh® system is manufactured from double-twist woven wire mesh, made from Zn-Al 5% galvanised steel and enhanced with a PoliMac® polymer coating. This advanced coating technology delivers a design life exceeding 120 years and is fully BBA HAPAS approved, offering superior durability and environmental performance compared to traditional PVC-coated alternatives.

From a construction perspective, the solution improved efficiency through factory-assembled facing units, combining woven mesh with a Class A galvanised welded mesh (50mm x 50mm apertures). This not only provided an architecturally appealing finish but also accelerated installation by reducing on-site assembly requirements. The system allows the use of smaller facing aggregates (typically 75mm clean stone), enhancing both buildability and visual consistency.

Each Mineral Terramesh® unit includes integral 3-metre reinforcement tails, forming a continuous connection between the facing and the reinforced soil mass. This ensures structural integrity while maintaining flexibility and adaptability during construction.

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *