RAILWAY SAFETY PROJECT FOR – TCDD ALAYUNT-BALI

Year
2023
Location
BALIKESİR, MARMARA
Client
MARMARA YAPI
Designer
Maccaferri Turkey

Challenge

The TCDD (Turkish State Railways) Alayunt-Balıkesir line, specifically the section between KM 131+052 and KM 131+240, faces significant safety risks due to the instability of the slopes along the railway track. These slopes pose potential hazards to the railway line, including the risk of rockfall and debris accumulation, which can endanger both the rail infrastructure and the safety of train operations. In order to ensure the safety of the railway line and protect against rockfalls and other geological hazards, appropriate engineering solutions were sought.

The slopes in the specified section of the Alayunt-Balıkesir railway line are vulnerable to rockfall, which can obstruct the tracks and cause significant damage to the railway infrastructure. The instability of these slopes, including loose rocks and weathered material, presents a serious risk to the safety of the railway operations. Given the proximity of the railway track to the unstable slopes, there was an urgent need to implement effective slope stabilization measures to prevent potential accidents and ensure continuous, safe operation of the line.

Solution

To address the rockfall risk and enhance slope stability, several engineering solutions were implemented. A primary measure involved installing an RB 750 Rockfall Barrier (H=3m, I=10m, L=188m) along the slopes to intercept falling rocks and protect the railway tracks from potential obstructions. Additionally, HEA Panel GLA (400x400 mm D10) panels were used to further stabilize the slopes and reduce the likelihood of rockfall. The combination of rockfall barriers and HEA panels ensures the long-term stability of the railway infrastructure and the safety of train operations in the area.

These solutions were carefully selected and applied based on the specific geological conditions of the area, addressing the immediate safety concerns while contributing to the ongoing stability of the railway line. Through these measures, the risk of rockfall and related hazards has been effectively minimized, ensuring the safe and uninterrupted operation of the TCDD Alayunt-Balıkesir railway line.

Download
the Success Story

RAILWAY SAFETY PROJECT FOR – TCDD ALAYUNT-BALI

Download
RAILWAY SAFETY PROJECT FOR – TCDD ALAYUNT-BALI

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *